A generator is a capital purchase that replaces a recurring cost. In seafood the recurring cost is usually larger than the owner expects, because it is spread across chlorine for water, sanitiser for surfaces, and an ice and water operation that nobody costs as a sanitation line. This page builds the case the way a processor’s finance team will want to see it.
About claims on this page
EcoloxTech generators produce a hypochlorous acid solution on site. They are regulated by the EPA as devices, are not registered disinfectants, and we make no efficacy claims for them or for the solution they produce. The only EcoloxTech product with disinfection claims is HOCl-AS200 (EPA Reg. No. 101112-1), used according to its label. Research cited here describes published studies of hypochlorous acid and electrolysed water under their own test conditions; it is not a claim for any product.
What to count today
Pull twelve months of invoices — a full season, not a quarter — then add the costs that never appear on a chemical invoice.
| Cost | Where to find it | Often missed? |
|---|---|---|
| Chlorine and sanitisers the generator can replace | Supplier invoices, 12 months across the season | No |
| Water treatment chemistry for ice and chill systems | Often a separate supplier or contract | Yes |
| Freight and delivery charges | Invoices, usually a separate line | Sometimes |
| Dispenser rental and service | Contracts and maintenance records | Yes |
| Chemical store floor space | Area × cost per square foot — chilled, food-safe space is expensive | Yes |
| Receiving, stock control and dilution labour | Minutes per shift × loaded rate × shifts, weighted for peak season | Yes |
| PPE and spill kits for concentrate handling | Consumables spend | Yes |
| Container and waste disposal | Waste contracts | Yes |
| Product downgraded, held or dumped on sanitation grounds | Deviation and quality records | Usually |
| Shelf-life shortfalls and returns | Customer claims, credits, short-code writedowns | Almost always |
What to count with a generator
- One-off: the system, installation, feed-water treatment, holding tank, pumps, distribution to the line and to the ice plant, plus commissioning and training.
- Ongoing: food-grade salt or ready-mixed brine, water, electricity, replacement filters, service parts, and test strips or photometer reagents.
Distribution to the ice plant is the line most often left out of a first estimate, and it is often the largest single piece of the install in a seafood plant.
The model
Three numbers: A, the annual cost today that the generator replaces; B, the annual running cost with the generator; C, the one-off cost. Annual saving is A − B, payback is C ÷ (A − B), and five-year net is 5 × (A − B) − C. If A is not comfortably larger than B, a generator is not the answer for that plant, and we will say so.
A worked example
Hypothetical figures for a mid-size processor running a filleting line and an ice plant, with a pronounced season, to show the method. Your audit uses your invoices and utility rates.
| Line | Figure |
|---|---|
| A — chlorine and sanitisers replaced | $44,000 / year |
| A — water treatment for ice and chill systems | $9,000 / year |
| A — freight, dispensers, storage, dilution labour, PPE, disposal | $14,000 / year |
| A total | $67,000 / year |
| B — salt or brine, water, electricity | $6,500 / year |
| B — filters, service, test consumables | $4,500 / year |
| B total | $11,000 / year |
| C — system, water treatment, tank, pumps, distribution to line and ice plant, install | $68,000 one-off |
| Annual saving | $56,000 |
| Payback | about 15 months |
| Five-year net | about $212,000 |
How sensitive is it?
Holding the one-off at $68,000 and running costs at $11,000 a year:
| Annual cost replaced (A) | Annual saving | Payback | Five-year net |
|---|---|---|---|
| $25,000 | $14,000 | about 4.9 years | $2,000 |
| $40,000 | $29,000 | about 2.3 years | $77,000 |
| $67,000 | $56,000 | about 15 months | $212,000 |
| $100,000 | $89,000 | about 9 months | $377,000 |
Below roughly $25,000 a year of replaceable spend, a full system with distribution to an ice plant is hard to justify on chemistry alone, and a smaller unit serving the highest-volume tasks is usually the better answer. Above it, the question becomes how to size and install rather than whether.
Seasonality changes the shape of the case
Most sanitation business cases assume a flat year. Seafood rarely has one. Chemical spend peaks exactly when landings peak, which is also when storage is tightest, labour is scarcest and a run-out is most expensive. A generator converts that peaky variable cost into a fixed asset cost plus a small variable one, and it removes the failure mode where the programme degrades in the busiest fortnight of the year.
Two practical consequences. Size for the peak week, not the average, or plan a holding tank and accept the storage time. And when you model the saving, model it by month rather than annually — the cash-flow picture is often more persuasive than the total.
Shelf life, the line nobody counts
In a chilled fish business, a day of shelf life is margin. It shows up as fewer short-code writedowns, fewer customer credits, wider distribution radius and better fill rates on the days that matter. Published work looking at treated ice and wash water from this angle includes sanitised ice on fish fillets and in the melt water, electrolysed water ice and the quality of shrimp and shelf life of King George whiting and Atlantic salmon fillets — research under each study’s own conditions, not a claim for our systems.
The way to include it honestly in a business case is to measure it: run a shelf-life comparison in the pilot, before and after, on the same species and the same route to market. A measured day is a number the finance team can use; an asserted day is not.
Building the business case
- Twelve months of invoices, by product and volume, covering a full season.
- The task list: area, method, volume per use, frequency.
- Ice and chilled-water volumes, and the chlorine demand measured in each.
- Time-and-motion on receiving, storage and dilution, weighted for peak.
- Utility rates for water and electricity.
- Install location, water supply, drainage, power, and the route to the line and the ice plant.
- The tasks that must stay on a registered product.
- Quality, hold and shelf-life records that touch sanitation.
The free sanitation audit assembles this into a written model, sizes the system, and tells you when a generator is not the right answer. Leasing turns the one-off into a monthly payment for US businesses, which suits a seasonal cash flow.
Two other shapes
Not every seafood business is a mid-size processor with its own ice plant. Two other patterns come up constantly.
The small day-boat or artisan processor. One line, a handful of staff, perhaps $15,000 a year of replaceable spend and ice bought in rather than made. A full system with distribution rarely pays back quickly here. The sensible options are a smaller unit serving the two or three highest-volume tasks, a ready-to-use registered product for anything needing a documented claim, or leasing to convert the capital cost into a monthly payment that tracks the saving.
The multi-site group. Several plants, each spending $25,000–45,000, often with one ice-heavy site and several lighter ones. Run the model per site: the ice-heavy site almost always justifies a system first, and the group benefit comes from standardising SSOPs, logs and training across all of them — which is frequently worth more than the chemical saving at the smaller sites, because customer audits stop producing different answers at different plants.
Where the saving shows up
Finance teams reasonably ask where the money appears. Chemical spend falls on the sanitation and consumables lines, and freight and disposal fall with it. Salt, water, electricity and service appear as new, smaller lines. Labour usually does not fall as headcount; it shows up as time returned to tasks that were being squeezed at peak. Space is a soft saving until the site needs the room, at which point it is very real. Quality effects — shelf life, downgrades, credits — are the hardest to attribute and often the largest, so measure them during the pilot rather than claiming them afterwards.
Frequently asked questions
What payback should we expect?
It depends entirely on replaceable spend, and in seafood that includes water and ice treatment, not just surface sanitiser. Run the model with your own numbers; the audit does it from your invoices.
Should we count shelf life?
Only if you measure it. Run the comparison during the pilot and use the measured figure.
Does it reduce water use?
Sometimes, where a rinse step legitimately goes away under the applicable rule. Generation also uses water, and ice production dominates the total. The audit models both.
Can we lease instead of buying?
Yes, for US businesses: a 24-month lease turns the one-off into a monthly payment, which fits a seasonal business better than a capital outlay before the season.
Our chlorine is very cheap. Does the case collapse?
Then it rests on handling, storage, consistency, run-outs and shelf life. If those do not add up either, we will tell you.